Time and Work Questions and Answers
Time and work aptitude problems with solutions.
FAQ
Time & Work FAQs
Common questions and clear answers for this topic.
What is Time and Work and what is the basic concept?
Time and Work problems involve finding how long it takes to complete a task. Basic concept: If A can do a work in n days, A's one day work = 1/n. If A and B together can do work in n days, combined one day work = 1/n. Key formula: Total Work = Efficiency x Time. Time and Work is a major topic in SSC CGL, IBPS Bank PO, SBI PO, CAT, and Railway exams.
How to solve Time and Work problems using LCM method?
LCM Method: Assume total work = LCM of given days. Calculate each person's work per day = Total work divided by Days. Combined work per day = Sum of individual work rates. Time = Total work divided by Combined rate. Example: A can do work in 10 days, B in 15 days. LCM(10,15) = 30 units. A's daily work = 3 units, B's = 2 units. Together = 5 units/day. Time = 30/5 = 6 days. This avoids fractions and is much faster.
How to solve problems when people join or leave work midway?
When worker joins midway: Find work done before and after they join. If A works for x days and B joins for y days, Total work = A's work in x days + (A+B)'s work in y days. Example: A alone in 20 days. If A works 6 days then B joins, to find when work completes: A's 6 days work = 6/20 = 3/10. Remaining = 7/10. If A+B together rate = 1/12, days to finish = (7/10)/(1/12) = 8.4 days.
What are Pipes and Cistern problems in Time and Work?
Pipes and Cistern: Inlet pipe fills cistern (positive), Outlet pipe empties cistern (negative). If inlet fills in x hours, rate = 1/x per hour. If outlet empties in y hours, rate = 1/y per hour. Net rate = 1/x - 1/y. Time to fill = xy/(y-x) hours if y > x. Cistern fills if net rate is positive. These problems are standard in IBPS, SBI, and SSC competitive exams.
What is work equivalence and efficiency in Time and Work problems?
Work Equivalence: Men x Days = Women x Days (when efficiency ratio is known). If 1 man = 2 women in efficiency, then 10 men = 20 women. Men-Days concept: 10 men x 5 days = 50 man-days. If 8 men do same work, days = 50/8 = 6.25 days. For wages: divide total payment in ratio of work done. If A and B complete work together and A worked fewer days, calculate individual shares accordingly.
Related Practice
Parent category aur related practice pages se apni preparation continue karein.
Similar Topics
Practice related topics from the same category.
Top 5 Topics
Open high-value topics for stronger internal linking.
Top 5 Categories
Explore popular categories for more exam practice.